Offering for commercial or public sector


Energy Efficiency 

If you are starting out and have not yet carried out a survey on what the energy efficiency possibilities in your housing association are, these offerings are a good place to start.

Discussions & Questions

Energy efficiency investment and cost optimisation Read more

Study that aims to find the most profitable energy efficiency investments for the property in question. Simulation tools or other methods are used to map out those energy efficiency investments with shortest payback times.

Smart heat pump Read more

The intelligent heat pump control service helps property owners to optimize heat pump electricity use and costs. The control service includes both heat pump enhanced control and price-based control.

Heating 

A well-executed heating network rebalancing starts with a planning project. Once you know possible repair needs and the extent of the work, it is time to ask for rebalancing implementation offers. If you are unsure what the different heating options for your housing association, Heating system comparison -project helps you map out the pros and cons of different options.

Discussions & Questions

Heating network rebalancing planning Read more

When the building’s heat network is adjusted, in addition to living comfort, savings are made in energy consumption. The work entails making the heating network rebalancing plan and identifying items to be replaced. The planning study is used in an offer request for the actual rebalancing work.

Heat network rebalancing implementation Read more

In the heating system rebalancing, the heating network is adjusted according to the heating system rebalancing plan. It is estimated that with a correctly performed basic adjustment, up to 10–15 % savings in energy consumption can be achieved. Previously contracted heating network rebalancing plan can be attached to the offer request.

Heating system comparison study Read more

The heating method comparison includes a situation survey in the building, suggestions for improvement and project planning from the perspective of technical and economic implementation.

Heating distribution center renewal Read more

In district heating buildings, the technical service life of the heat distribution center is approximately 20–25 years. After this, the risk of breakage and heat distribution problems increases. Renovating the heat distribution center also improves energy efficiency.

Electric vehicles 

When considering an EV charging station for your housing association, employ an independent expert to carry out a planning study. Then you are better informed to create an offer request for the implementation stage.

Discussions & Questions

Charging station project planning Read more

In the project EV charging station implementation method options and the costs related to the different options are analyzed. The most suitable option is presented. The project produces documentation that can directly be used in the offer request process.

EV charging station implementation Read more

Request for a tender for EV charging station for a property.

Lighting 

When starting to consider a outdoor lighting improvement for your housing association, employ first an independent planning consultant. Then you are all set to proceed to asking implementation offers for your project.

Discussions & Questions

Outdoor lighting project planning Read more

The consultant is responsible for creating the outdoor lighting plan and generating the documentation needed for tendering. Optionally the Buyer can also include in the work bidding phase management, comparison of received offers, and monitoring of the project implementation phase.

Outdoor lighting implementation Read more

Request for a tender for EV charging station for a property.

Consulting 

When entering into legal agreements in implementation stage, it is advisable to have a legal professional with experience in ground heat / EAHR / other type of housing association renovation projects to read through the agreement to point out possible risks and shortcomings. For ARA grants, an expert can help you estimate the eligibility for a grant and also carry out the needed calculations.

Discussions & Questions

Legal agreement consultation Read more

A project implementation agreement is a legal document outlining the terms and conditions of a particular project. Especially in project implementation agreements it is advisable to have a legal expert to review and revise the agreement before signing.

Air-water heat pumps 

Start an air-water heat pump project with a planning study. Use the planning study results and the estimated investment cost and payback time to make a decision if the housing association wants to proceed with implementation. When asking an implementation offer, you can attach the planning document to the offer request.

Discussions & Questions

Water-air heatpump heating pre-study Read more

The air-to-water heat pump takes heating energy from the outside air and transfers it to the water circulation heating system of the building. It can also be used to heat the building's hot domestic water.

Water-air heatpump implementation Read more

Request for a tender for an air-water heat pump implementation project for a building.

Ground heat 

When starting to consider a ground heat system for your housing association, start first with a pre-study. If the pre-study shows a green light and you have decided to proceed, you may want to have an independent project consultant to help with planning, permits and project supervision. Then you are all set to proceed to asking implementation offers for your ground heat project.

Discussions & Questions

Ground heat system pre-study Read more

In the ground heat pre- study, the building owner receives a written report on the acquisition of geothermal energy and its implementation from the point of view of profitability.

Ground heat project planning Read more

The consultant acts as the general project manager for the ground heat implementation phase. The consultant creates documentation that can directly be used in the offer request process. Additional work tasks are selected from offer request list of options.

Ground heat project implementation Read more

Request for a tender for a ground heat project for a property. Ground heat pre-study and/or offer request documentation generated by the ground heat project consultant can be attached to the offer request.

EAHR 

When starting to consider EAHR system for your housing association, start first with a pre-study. If the pre-study shows a green light and you have decided to proceed, you may want to have an independent project consultant to help with planning and project supervision. Then you are all set to proceed to asking implementation offers for your EAHR project.

Discussions & Questions

EAHR -system pre-study Read more

In the Exhaust air heat recovery (EAHR) pre-study, the possibility of implementing an EAHR system in the building is assessed. It is presented whether there are any obstacles or preconditions for continuing the EAHR procurement process and what the recommendation for next steps is.

EAHR project planning Read more

In the project planning different exhaust air heat recovery (EAHR) solutions suitable for the building are compared. The project time table and the qualitative and financial targets for system implementation are set. Project produces material that can be used directly in procuring offers.

EAHR project implementation Read more

Request for a tender for a exhaust air heat recovery (EAHR) project for the property. You can attach EAHR pre-study and/or tender documentation made by a EAHR project consultant to the offer request.

Solar PV 

Start a solar PV project with a planning study that includes a mapping visit. Use the planning study results and the estimated investment cost and payback time to make a decision if the housing association wants to proceed with implementation. When asking an implementation offer, you can attach the planning document to the offer request.

Discussions & Questions

Solar PV (with storage) prestudy Read more

The work includes a mapping visit, a simulation/calculation of the energy output, the clarification of technical details and possible limitations related to the installation, and a preliminary cost estimate. The solar PV power plant is connected to the property's electricity connection.

Solar PV (with storage) implementation Read more

Request for a tender for solar PV power plant solution for a property. Optional to add storage option to the offer request.

Air 

If you want to get more out of the existing infrastructure in your housing association, checking the ventilation condition is a good idea. You may reach savings in needed heating energy and better indoor air quality.

Discussions & Questions

Ventilation measurement and adjustment Read more

Measurement and adjustment of the ventilation system according to the ventilation plan. Improper adjustments can cause significant extra energy consumption.

Indoor air survey Read more

An indoor air survey can be carried out either as a needs survey of the problem apartment or apartments or the entire property, or by taking samples and measurements of the air in the problem space and giving an interpretation of the measurement results.

Financial services 

Product by Action Energy Finance Oy

Project finance consulting Read more Q&A

Are you operating a clean infra business where you or your customer needs assistance with asset financing?

We can offer you the following services:

  • Structuring the asset business (SPV, HoldCo, OpCo or some other structure)
  • Cashflow calculations for your specific needs
  • Fundraising for the financing vehicle 

The specifics of the consulting work is agreed with the client case by case basis.